Five Set of Knowledge Test Papers with Answers (Set 4)

images (11)

The correct answer is shown in BOLD

1. A key reason for lost productivity is

• Not implementing TQM

• Mgmt. not listening to workers

• The hidden factory

2. Most auto accidents are

• Correlated with fuel efficiency

• Caused by chance

• Preventable

• At 6 sigma level

• Caused by bad design

3. A system involves

• Components

• An overall objective or mission

• Humans, procedures, technology

• Environment in which it operates

• All above

4. A process is predictable if

• We can forecast its output

• It is always at the same level

• It has no humans involved

• The data can be plotted on a chart

• The same workers stay employed

5. Range of 1, 2, 3, 4, 5 is

• 5

• 4

• 3

• 2

• 0

6. The quantity sigma (σ) indicates

• Trend in the process

• Dispersion in the data

• Lack of attention by workers

• Average

• Range

7. When you have too many factors on a fish-bone chart, then

• Take top ten

• Take top five

• Inquire to find which factors are suspected to be significant

• Conduct design of experiments

• Talk to customers

8. The word Control implies

• Inspecting every item

• Plotting charts

• Using a signal to adjust the process

• Management by Objectives

• Team control the shop

9. QFD is a method for

• Controlling quality in production

• Controlling quality in restaurants

• Finding out what customer wants

Translating customer needs to product specs

• Quality circles

10. A Capable Process

• Is never outside control limits

• Meets or exceeds spec requirements

• Has no defects in output

• Has good management support

• Is ISO 9000 certified

11. DOE may fail because

• Control charts are incorrectly drawn

• No team involvement

A key factor has been left out

• Top management not visible

• Workers overzealous

12. TQM is part of

Strategic management

• ISO 9000 certification

• QS 9000 certification

• Hospital management

• Project reviews

13. The word target in quality means

• The specification

• The control limits

• X-bar points on the chart

• The ideal quality requirement

• Six sigma production

14. Six sigma requires

• Process knowledge

• An indulging mindset

• Action on causes of defects

• DOE trials

• All above

15. Spec limits are used for

• Talking to workers about quality

• Adjusting control charts

• Finding process capability

• Drawing R charts

• Troubleshooting

Quote 2

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: